Showing posts with label Sounds. Show all posts
Showing posts with label Sounds. Show all posts

Wednesday, 27 January 2010

The big O

Yes, do make fun of me as much as you like...but I have this dirty secret. I like my opera and my classical music every once in a while. I am one of those who mostly get it through recordings, but hey!...

So, it seems that one can work on THESE little babies: adaptations for the screen of operas or of classical music (a sort of video clip if you will). I know I should be more coherent and make a critical assessment of these, and I will try to sometimes later....but for now...it`s just....WOW:



 

Monday, 16 November 2009

PlayLis(z)t

Never a bad time to get some musical inspiration for future/possible/probable soundtracks. Tonight`s special:

Masked Ball by Jocelyn Pook, but this time, the unaltered version, which is a Greek Orthodox chant for mass in Romanian. For the scene in Kubrick`s Eyes Wide Shut, they have played it backwards.



This song is called The Tired Sun Tango...and I came across it while watching a documentary on Russian cutout animation artist Yuri Norstein

Tuesday, 27 October 2009

Day 0.4

Tuesday:

After having a light and camera rehearsal on Monday, as well as having a meeting to go over the changes made to the script, we decided to move all the equipment to the location where we`re going to do the filming on Wednesday. The locations, a cellar, a kitchen, and an outside look of a house, have all been risk assessed by Alan and we have been given permission to film. He also arranged for the transport of the group to the location.

The kitchen:




The cellar:





The house:



We split-up into two groups: Ryan, who is in charge with sound (pre-)recording and Alan have set out to capture some of the sound effects that we will be needing for the final editing, and the rest of the group (Abdul, myself, Duncan and Umar) was busy coming up with different ideas for camera/lights angles/position and help put them into practice. Lighting the kitchen has been quite a challenge, and I am still not sure if I am happy with the result (I get to much exposure on certain parts of the face), but we have marked out the places for the set-up we have tried today, so tomorrow hopefully we can start from there and come up with some last minute ideas to solve that problem. Abdul has also drawn up a floor plan. The lighting for the cellar scenes looks more promising. We have used one of the lights and had it bouncing of the wall, and made it look like its source is a lamp that is placed just near the subject. I suggested using a CTB gel, because the CTO one just seemed to soft and tangerine-like. Also, the colour treatment of the kitchen scene required something similar, I think, so as not to have too stark a contrast between the two scenes.

We have had some troubles with the actors...with the actress, to be more precise. She came down with a flu, and her presence is uncertain. Alan has come up with a back-up plan, having contacted a professional actress who might be interested. Until tomorrow though, I am afraid that`s a cliffhanger...

Friday, 23 October 2009

Day 0.1

Today`s seminar on the sounds we would consider including in the MALac script was really good, both for brainstorming within the group and sorting out our own scenario, and for comparing ideas with the other groups. Things seem to come together now. We had to make a list of sounds for:

*Music
*Special Effects
*Voices
*Ambient

Taking into account the conditions on our selected location (which will be a basement), we realised we`ll have to do some pre-recording of special effects and also some voice-overs.

We have a new team member as well, Ryan who will do sound recording and one of the tasks. Duncan will be adding the changes and instructions we`ve added to the script and discuss the new version during our next meeting on Monday. Also on Monday, I`ve arranged to book out the studio rooms and lighting, camera and sound equipment to do some rehearsals. Abdul and Duncan will try to get in touch with the people who have already showed interest to act. Hopefully, that will be settled as soon as possible.

Now that we have a location, Alan is doing the risk assessment over the week-end and Abdul will get the story boards ready after discussing the changes with Duncan.

So, that leaves me, Ryan and Umar to do our best on Monday and get our act together with the lighting, camera work, and sound recording, respectively. Oh, and Alan will do the (pre-)production stills